Starbucks building, Visitation Street, ST-CHARLES-DE-BORROMÉE
Medium Diamond 24ga Black Prespectra wall on horizontal metal furring
Project designed by Lachance & Associés Architects
Installation contractor: Aluminium André Gagnon Inc.

The restoration of the roof at the Marisol project House, located at 12 Broad Street, Gatineau, is now complete. The product is a 4-fold Canadian 3R tile in Metallic Gray (QC7500), with a covered dimension of 241 mm x 527 mm (9½” x 20¾”), installed at 30 degrees in a staggered pattern with a starting flat sheet.
Installer: Masic Metal Roofing.

At the Grand Prix du Design Gala held in Montreal on November 13, 2025, the Comox Waterfront project on Vancouver Island was awarded, marking a significant milestone for Cohlmeyer Architecture and 3R Tiles. Architect Daniel Cohlmeyer led the design, while Stéphane D’Anjou, president of 3R Tiles, represented the company that supplied the innovative materials.

The pavilions feature Square tile 4-fold, made of 0.8 mm aluminum with a Champagne Premium PVDF finish, installed at a 45° aligned angle, combining technical excellence with refined craftsmanship. For 3R Tiles, this award confirms the quality, durability, and aesthetic potential of their products in prestigious projects.

For Cohlmeyer Architecture, this recognition highlights their visionary approach, which combines elegance, sustainability, and material innovation. The collaboration between the architect and 3R Tiles demonstrates how material expertise and bold design can come together to create award-winning architecture.

Completed construction work: Curtis, Curtis Rest Area, Hwy. 55, Km 6, Stanstead. On the roof and wall, the Dutch Seam panel MRD194 (19.25″) without reinforcement seams, 0.040″ aluminum, PVDF colors Redwood (07).

Designer/Initiator: BGLA Architecture Urban Design

Installer/Contractor: Évolu-Toit

Expansion of the Microbrasserie du Lièvre at 131 Albiny-Paquette Boulevard

The facades with 24-gauge Large Diamond 4-ply Steel tiles in Metallic Gray (QC7500).

Project by GBA Architectes.

Installation contractor: Altitude toiture revêtement .

Construction work is complete at Mabelleart, 1106 Logan Avenue
Toronto, Ontario. The facades and roof are finished with 0.8mm (0.032″) Square 4-ply aluminum tiles in PVDF Titanium Premium (35) color.

Project by LGA Architectural Partners.

Installation contractor: Desar Construction Studio Inc.

Construction is underway at Lucille Teasdale High School at 8350 Boul. Pelletier, Brossard, QC . The facades feature Dutch Seam Aluminum 0.040″ panels, a PVDF color combination of Patina Green (12), Matte Black (32), and Forest Green (11).

Consortium: COEX architecture + Ruccolo Faubert

Installation contractor: Revêtements Extérieurs Raymond

Construction of the first phase of the WAYWAYSEECAPPO commercial project in Brandon, Manitoba, is completed. The facades are clad with 24-gauge Pyramid Grand steel tiles, in PVDF, in a color combination of Bone White (26), Ash Grey (38), Slate Grey (20), Black (02), Brite Red Premium (17), Brilliant Yellow.

Project by Samson Architecture/Engineering.

Installation Contractor: Diamond Edge Buildings

Tuiles 3R 2026 ©